Day 10

Today more effort was put into recording. Trench two was completed and  trench one started.

Vicky provided home made cake and was careful with her sectioning!

Some features were also tested today including some drains cuts.

TAS_1717w

‘Careful Steve watch you dont reverse the stratigraphy!’

TAS_1719w

Drain top stones removed Trench two

TAS_1724w

Inside drain Trench two

TAS_1726w

Overall view of site with trench one in foreground.

TAS_1731w

Spot the later phase drain

TAS_1735w

One in the eye!

 

 